##// END OF EJS Templates
subrepo: fix for merge inconsistencies...
subrepo: fix for merge inconsistencies Merging ancestors with children is allowed if they are on different named branches. This did not work for subrepo merges before. To fix this inconsistency, the mergefunc() will now use the simple update path only if both versions are on the same named branch. If not, they get merged into a new changeset, just as if you did the merge from the subrepo's root directly.

File last commit:

r13887:06803dc5 merge default
r16196:8ae7626d stable
Show More
dates.txt
36 lines | 1.2 KiB | text/plain | TextLexer
Some commands allow the user to specify a date, e.g.:
- backout, commit, import, tag: Specify the commit date.
- log, revert, update: Select revision(s) by date.
Many date formats are valid. Here are some examples:
- ``Wed Dec 6 13:18:29 2006`` (local timezone assumed)
- ``Dec 6 13:18 -0600`` (year assumed, time offset provided)
- ``Dec 6 13:18 UTC`` (UTC and GMT are aliases for +0000)
- ``Dec 6`` (midnight)
- ``13:18`` (today assumed)
- ``3:39`` (3:39AM assumed)
- ``3:39pm`` (15:39)
- ``2006-12-06 13:18:29`` (ISO 8601 format)
- ``2006-12-6 13:18``
- ``2006-12-6``
- ``12-6``
- ``12/6``
- ``12/6/6`` (Dec 6 2006)
Lastly, there is Mercurial's internal format:
- ``1165432709 0`` (Wed Dec 6 13:18:29 2006 UTC)
This is the internal representation format for dates. The first number
is the number of seconds since the epoch (1970-01-01 00:00 UTC). The
second is the offset of the local timezone, in seconds west of UTC
(negative if the timezone is east of UTC).
The log command also accepts date ranges:
- ``<DATE`` - at or before a given date/time
- ``>DATE`` - on or after a given date/time
- ``DATE to DATE`` - a date range, inclusive
- ``-DAYS`` - within a given number of days of today