##// END OF EJS Templates
hook: schedule run "b2x-transactionclose" for after lock release...
hook: schedule run "b2x-transactionclose" for after lock release Hooks that run after the transaction need to be able to touch the repository. So we need to run them after the lock release. This is similar to what the "changegroup" hook is doing in the `addchangegroup` function.

File last commit:

r22557:ace83201 default
r23047:f10019d2 default
Show More
revsetbenchmarks.txt
32 lines | 652 B | text/plain | TextLexer
all()
draft()
::tip
draft() and ::tip
::tip and draft()
0::tip
roots(0::tip)
author(lmoscovicz)
author(mpm)
author(lmoscovicz) or author(mpm)
author(mpm) or author(lmoscovicz)
tip:0
max(tip:0)
min(0:tip)
0::
min(0::)
# those two `roots(...)` inputs are close to what phase movement use.
roots((tip~100::) - (tip~100::tip))
roots((0::) - (0::tip))
::p1(p1(tip))::
public()
:10000 and public()
draft()
:10000 and draft()
max(::(tip~20) - obsolete())
roots((0:tip)::)
(not public() - obsolete())
(_intlist('20000\x0020001')) and merge()
parents(20000)
(20000::) - (20000)
# The one below is used by rebase
(children(ancestor(tip~5, tip)) and ::(tip~5))::